Toyota Tusho

San Antonio, Texas
General Contractor: RC Page Construction

Design Build Industrial Facility & 18-Wheeler Parking Expansion

CSE partnered with R.C. Page Construction on a design-build industrial project that included a new 18-wheeler parking lot and comprehensive electrical infrastructure upgrades to support warehouse and office operations.

This project required coordination between high-capacity service installations, tenant-ready warehouse power, and large-scale site lighting to ensure long-term operational reliability.

Electrical Scope Included:

Electrical Services Installed

• 1200A service serving the spec space
• 100A service dedicated to the new parking lot

Spec Space Electrical Scope

• Complete office lighting and lighting controls
• Controlled receptacles for energy efficiency compliance
• Power distribution to HVAC systems including:
– 10 RTUs serving the warehouse
– 2 RTUs serving the office
• Dedicated 250A, 208V electrical system for IT room HVAC
• High-bay warehouse lighting
• Power integration for 20 loading dock levelers
• Infrastructure to support 15 forklift charging stations

The warehouse electrical design was engineered to support heavy operational demand while maintaining flexibility for future tenant adaptation.

Site & Parking Lot Scope

• Installation of 15 light poles for full site illumination
• Power distribution to a newly constructed guardhouse
• Dedicated parking lot service for expanded truck operations

From service entrance through final site lighting, CSE delivered a scalable and code-compliant electrical system that supports both high-volume warehouse logistics and expanded fleet operations.

Previous
Previous

FloPak Inc

Next
Next

St. Elizabeth Ann Church